Include the names of any expediter. CANNOT WORK WHEN GOWANUS EXPRESSWAY HAS MORE THAN 1 LANE CLOSED SOUTHBOUND. NO WORK IS TO BE PERFORMED WITHIN A BLOCK FRONTING A SCHOOL INCLUDING INTERSECTIONS FOR ONE HOUR PRIOR TO SCHOOL START TIME THROUGH ONE HOUR AFTER END OF SCHOOL TIME. All applicable fees will apply. (212) 839-2387/88/89 TWO SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. Bridge (BOB) hold Any planned work requiring a Building Operations/ Construction Activity Permit that may potentially be within 100 feet of a bridge structure will be placed on a Bridge hold. NYCStreets system will automatically block an applicant from submission if insurance is not current. The second permit for canopy maintenance is automatically placed on a. An EAN is required for each utility access cover opening at a location, provided that the work is performed around the clock until the emergency is eliminated, at which time the EAN expires. The applicant may be required to address the circumstances of a hold before a permit is released. THIS STIP IS USED FOR WORK IN A TRAVEL LANE. Staten Island NY 10301 AS A CONDITION OF THIS PERMIT A CONSTRUCTION MANAGER FAMILIAR WITH THIS PROJECT IS REQUIRED TO ATTEND WEEKLY TUESDAY MEETINGS AT 115 BROADWAY 5TH FL OF THE L.M.C.C.C. To have the hold released, the permittee must correct the unsafe condition, and then contact HIQA to arrange for an inspection. 16 Court Street, 15th floor Download a PDF of theGlossary and Appendicesfor offline access to the Resources section. DOT currently specifies 3000 Kelvin as the color temperature for all luminaires. Unsafe Conditions If the permittee has been notified and fails to address an unsafe condition, all future permit requests may be placed on hold until the unsafe condition has been eliminated. It is essential to call New York 811 before digging anywhere, including sidewalks and soil. 1150 Clove Rd. DOT's preference is that there is no split in Pedestrian Flow. 16 Court Street, 16th floor 47-40 21st Street Apply for a parking permit. A one-time Street Opening Permit must also be obtained to install the poles that support the canopy. Payment of the waiver request fee, as specified in the Highway Rules, Section 2-03, does not guarantee that approval to work during the embargo period will be granted. MAY BE INTERMITTENTLY CLOSED TO THROUGH TRAFFIC WITH THE USE OF FLAGGERS WHILE PROVIDING LOCAL ACCESS AT ALL TIMES FOR A MAXIMUM OF 90 MINS. To release an FCR hold, the applicant must demonstrate that either he or she has begun the CRIA process or that the CRIA statement is not required. Second, after obtaining HIQA's authorization, the applicant must obtain a permit to install the canopy at the approved location and apply for a permit to maintain the canopy once it is installed. See Section 3.5.1 Holds for more information. Permits that have expired may be reissued only within30 daysof expiration. The location to which the application should be submitted depends on the location and type of construction-related work to be performed: Central Permit Office in ManhattanIn-person applications for non-emergency work, including work on all streets in Manhattan and on all critical streets in Brooklyn, Queens and the Bronx; all work to be performed for sewer and water system construction; and all capital project work, all utility work, all crane requests, and all full closures of sidewalks and roadways must be submitted only to the central Permit Office in Manhattan. Similarly, the sooner a potential street excavator knows about NYC DOT's intent to work in a particular location, the better it can make arrangements to avoid or reduce potential conflicts. 24 West 61st St., 5th Fl. Bronx, NY 10457 WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF ANY OTHER JURISDICTION SUCH AS PRIVATE PROPERTY, STATE, FEDERAL ETC., IT IS THE PERMITTEES RESPONSIBILITY TO DETERMINE THE PROPERTY OWNER AND OBTAIN THE WRITTEN APPROVAL. It also provides cross-references to useful online forms and tools. CONSTRUCTION PROJECT INFORMATIONAL SIGN REQUIRED PER DOT HWY RULE SEC 2-02(C) 4 & 5. In addition, a vault license from NYC DOT's Office of Franchises, Concessions and Revocable Consents is required to construct a new building vault or enlarge an existing building vault. The Highway Rules, Section 2-07(c) (4) contains additional information. To request authorization for the installation of a canopy, an applicant must initiate the process at the HIQA office in the borough where the proposed canopy will be located. 350 St. Marks Place, Main Floor HIQA Central Office ONE 11 FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY FOR MAXIMUM OF48 HOURS. THIS PERMIT ALLOWS FOR INSTALLATION OF TEMP ROADWAY/PAVEMENT MARKINGS AND/OR TEMP CONSTRUCTION REGULATORY SIGNS AS PER APPROVED MPT PLANS. (212) 442-1890 A valid permit issued by DOB is usually required in order to apply for permits in this category. New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . NYC Parks & Recreation 120-55 Queens Boulevard NO NOISY OPERATIONS BETWEEN 12:01 AM AND 7:00AM. StatenIsland.Forestry@parks.nyc.gov When a need exists to develop special details similar to the standard details, consultants may request copies of the .dgn files from their NYSDOT Project Managers. Staten Island, NY 10301 At the foundation of the city that never sleeps lays a network of streets that helps keep New York and New Yorkers moving forward. 1A. CPI holds are regularly released by the borough Administrative Superintendent of Highway Operations (ASHO) if the proposed work does not interfere with the in-house street resurfacing operation. All other times: (718) 433-3447, The Bronx and North Queens (north of the Long Island Expressway) Upon satisfactory payment, the hold(s) will be released. New York City streets include a complex mix of assets such as electric, gas, telephone, cable, water, sewer and steam lines, requiring coordination among the different asset owners when street work is performed. Share long-term capital plans for planned repairs, upgrades and new Each applicant must obtain and provide Worker's Compensation insurance in accordance with the laws of the State of New York from a licensed insurance company. This category also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. A table showing the agencies that must be contacted prior to applying for certain NYC DOT permit types can be found in, If the applicant intends to work on a contract that has been awarded by a government agency or authority, the applicant must bring a copy of the contract, Order on Letter, Notice to Proceed or a Letter of Authorization. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. During the application process, the NYCSTREETS system will automatically identify cases which require additional HE review, and processes them accordingly. APPROVED PLANS MUST BE ON SITE. Due to upcoming major building rehabilitation at 1400 Williamsbridge Road. If a permit application includes permit requests to work on embargoed streets within 90 days prior to the start of the HE (November 16th), the permittee will be presented with a warning, during the application process, stating that such permit request(s) will be subject to the upcoming HE. "Backfill" refers to the bottom layer of the restoration. Permits (hazardous storage/operations) (718) 999-2457, New York City Department of Information Technology and Telecommunications (DoITT) If repairs have not been made within the 75 day period, the City may make the repairs and bill the property owner for the cost of the repairs. This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. CONTINUED: (II) FIFTEEN FEET OF HYDRANTS (III) A CROSSWALK OR PEDESTRIAN RAMP, NOR SHALL IT BE STORED OR PLACED IN ANY MANNER AS TO OBSTRUCT ANY CROSSWALK OR PEDESTRIAN RAMP. The NYC Street Works Manual describes policies governing work on city streets, and presents procedures for notice, approval and execution of such work. Applicants who are registered as permittees (see Section 3.2) and are registered for on-line permitting can log-in to NYCStreets and request an EAN. Transformer vaults are typically installed, owned and maintained by an electric utility company. IF WORK IS MORE THAN 100FT AWAY, YOU MUST FORWARD CERTIFICATION. Canopies must be well-maintained at all times. OCCUPY 12 FOOT WIDTH OF ROADWAY. The completed application, affidavit, a stamped self-addressed envelope and a certified check made payable to NYC DOT for the permit fee (currently $70.00 for up to 300 linear feet) must be mailed to: The applicant submits permit application, proof of insurance (originally supplied during the registration process) and supporting documentation for review as to accuracy and completeness. Staten Island, NY 10301 A DOB-approved plan must be obtained and submitted to PEU with the application for a final approval and permit. WORK 8PM TO 5AM SUNDAY TO FRIDAY MORNING. New York, New York 10041. Tel: 718-556-7240 Immediately upon completing the compaction of the backfill of any street opening/excavation, a temporary pavement of an acceptable asphalt paving mixture not less than 4 inches thick after compaction must be installed flush with the adjacent surfaces; or, If plating or decking will be used, the size of the plate or decking must extend a minimum of 12 inches beyond the edge of the, Permanently Restored Opening / Excavation. Fax: 718-286-3183, Staten Island RESTORATION OF ROADWAY WHICH HAS RED COLORED BUS LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF TERACOTTA #103856 RIDE-A-WAY COATING MATER'L MFG'D BY INTERGRATED PAVING CONCEPTS INC OR EQUIVALENT. WORK 12:01 AM - 5 AM, MONDAY TO FRIDAY AND/OR SUNDAY 12:01 AM TO 8 AM, FULL CLOSURE OF ROADWAY, RESTORE FULL WIDTH WHEN SITE IS UNATTENDED. DOTs lighting-levels and uniformity guidelines are based on those established by the IES Roadway Lighting standard RP-8-14 (or more stringent where needed). The minimum slope, calculated on a line perpendicular to the curb, must be 1" in 5', and the maximum is limited to 3" in 5'. 811 or 800-272-4480. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. InspectionsAll work performed in the street is subject to inspection by the HIQA unit. NO NOISY WORK 10 PM TO 7 AM M-F, 10 PM FRIDAY TO 8 AM SATURDAY, 10 PM SATURDAY TO 9 AM SUNDAY AND 10 PM SUNDAY TO 7 AM MONDAY. 42 Broadway NYC DOT also routinely meets with utility companies and others who perform street excavations to inform these organizations of upcoming events and major construction projects with which NYC DOT is involved. All addresses must be the same on all above referenced documents. Special Notice: This edition was finalized before the state of emergency due to COVID-19; as city processes adapt in response to the crisis, they may temporarily differ from the guidance provided here. The applicant must obtain CGL insurance policies written by companies that may lawfully issue such policies, with an A.M. Best rating of at least A-VII or a Standard & Poor's rating of at least AA. Form must be notarized. Telephone inquiries: 8:30 AM-4:30 PM, Staten Island THIS STIP IS USED WHEN MORE THAN 50% OF THE INTERSECTION HAS BEEN EXCAVATED OR IF WORK CROSSES THE MIDDLE OF THE INTERSECTION. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Office hours: 8:30 AM-4:30 PM, Manhattan WORK HOURS 7 AM - 10 PM MON-FRI, AND 10 AM - 7 PM SAT AND SUN. To request release of the hold, the permittee must take out a permit of record for the work that was performed without a permit and then contact HIQA to submit a copy of the permit. BACKFILL/COMPACT IN 12 INCH LIFTS. Tel: (718) 482-4516 Applicants have two options to acquire an EAN. MAY WORK 24/7, OCCUPY CURB LANE, ALL EQUIPMENT, STORAGE OF MATERIAL ALLOWED. WORK 8 AM TO 7 PM MONDAY TO FRIDAY. AT REQUEST OF DEP LETTER DATED 6/16/05 WITH C.B. Permits reissued after three business days must be subject to the full permit fee. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. WORK ALLOWED 7 PM TO 6 AM NIGHTLY. The central Permit Office entrance is via Vietnam Memorial Plaza between Water and South Streets. Prior to any permit revocation, NYC DOT will give the permittee an opportunity to be heard with not less than two days' notice. NYC ADMINISTRATIVE CODE, 19-142, WORKERS ON EXCAVATIONS: A PERSON TO WHOM A PERMIT MAY BE ISSUED, TO USE OR OPEN A STREET, SHALL BE REQUIRED, BEFORE SUCH PERMIT MAY BE ISSUED, TO AGREE THAT NONE BUT COMPETENT WORKERS, SKILLED IN THE WORK REQUIRED OF THEM, SHALL BE EMPLOYED THEREON, (CONT. IES classification of lighting based on its photometric properties. 40 Worth Street 8th Floor All active permits in the affected area(s) are suspended during the dates and times of the embargo period and no new permits may be approved, unless a waiver for the work is granted by OCMC. WORK BEING PERFORMED IS FOR EMERGENCY SIDEWALK REPAIRS DUE TO TORNADOS. These policies and the Manual's presentation of permit procedures are designed to deliver higher quality street surfaces, fewer transportation capacity reductions and a more efficient construction environment to the people and businesses of New York City. If there is a hold during the processing of the permit, the applicant is notified of the type of hold and the steps to take to release the hold. 30-30 Thomson Avenue, 4th Floor BLKRES-RESTORE AS PER SKETCH #4 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Appendix ACommon Permit Types and Documents Needed, Appendix DOther Agency and Utility Contact Information, DOB BUILDER'S PAVEMENT PLAN (BPP) AUTHORIZATION FORM, (Initial submission only) Questions regarding permit registration or application processes can be directed to any Permit Office. The central Permit Office accepts money orders, company checks, certified checks and most major credit cards as payment for permit fees. Further information is available in Section 2-02 (h) of the Highway Rules. THIS PERMIT MAY BE EXTENDED ONCE ONLY, FOR A PERIOD OF 14 DAYS AT $40. The permittee may apply for a re-issuance online, or in-person by accessing either theApplication to Re-Issue Permitsor theApplication to Re-Issue Governmental Work Permit(s). MAXIMUM OF 11 FEET OF ROADWAY MAY REMAIN CLOSED AFTER WORKING HOURS ONLY FOR CONCRTETE CURING. (212) 839-4700 THE ROADWAY AND/OR SIDEWALK SHALL BE REPLACED IN-KIND. By mutually sharing data before detailed construction plans have been developed NYC DOT and street excavators can adjust their project plans to avoid conflict and maximize the potential opportunity for street work coordination. All street lighting designs must be approved by DOT Street Lighting Engineering Unit. Full Closure Review (FCR) hold An FCR hold is automatically placed on the 90th consecutive calendar day of any full street closure. Office hours: 8:30 AM-3:30 PM (in person) The construction of any vault that extends beyond the curb must be authorized under a revocable consent agreement, as required in Section 2-13(c) of the Highway Rules, in addition to approval by PEU. It could be because it is not supported, or that JavaScript is intentionally disabled. PERMITTEE IS PARTICIPATING IN CORE DRILLING PILOT PROGRAM. Long Island City, NY 11101 Manhattan.Forestry@parks.nyc.gov (212) 839-8847 WORK 9 AM TO 7 PM SATURDAY AND 10 AM TO 7 PM SUNDAY. Connecticut Department of Transportation Division of Traffic Engineering Email: DOT.TrafficElectrical@ct.gov. 120-55 Queens Blvd., Room 201 THIS STIP VOIDS ANY/ALL OTHER CONFLICTING STIPS ON THIS PERMIT UNLESS ACCOMPANIED WITH VARIANCE STIP VAR001. The hold is to review the proposed work and set conditions for the work and/or restoration. There are nearly 6,000 miles of streets in New York City. Sidewalk Construction Permits are designated as the "04" permit series, meaning all permits in this category begin with "04". WORK SATURDAY, 8 AM-6 PM AND SUNDAY 9 AM-6 PM. The latest edition is available for purchase for $50 from the Office of the Agency Chief Contracting Officer, 55 Water Street, Ground Level, New York, NY, 10041. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. WORK 9 PM TO 6 AM, MONDAY TO FRIDAY, MAINTAIN TWO 11 FOOT LANES FOR TRAFFIC, RESTORE FULL WIDTH TO TRAFFIC WHEN SITE IS UNATTENDED. APPROVAL FROM THE LANDMARK PRESERVATION COMMISSION IS REQUIRED BEFORE WORK COMMENCES. After obtaining HIQA's authorization, the applicant will be referred to the Permit Office in the borough in which the canopy will be located. IF CURB LANE BECOMES A TRAVEL LANE THIS STIP DOES NOT APPLY. Call before you dig. WORK ALLOWED 8 AM TO 4 PM SATURDAY. (718)786-8589 OR (718)786-8407, ONE SPEED REDUCER IS LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. Different from DOB, DOT plans requires 600 PSF live loads on all sidewalk doors, gratings, covers and vault structures. After the canopy passes final inspection, HIQA will release the hold and the applicant must return to the Permit Office to obtain the permit to maintain the canopy. WORK SOUTHBOUND ONLY. TO FRI. MICROSTATION SHEET MODELS. New York State Code of Rules and Regulations, Laws of New York(use this webpage to search for the below laws), Administrative Code of the City of New York, Zoning Resolution of the City of New York, American Association of State Highway and Transportation Officials (AASHTO), Institute of Transportation Engineers (ITE), National Association of City Transportation Officials (NACTO), NYC Department of Design and Construction, NYC Department of Environmental Protection, NYC Mayor's Office for People with Disabilities, NYS Department of Environmental Conservation, Downtown Brooklyn Traffic Calming Study (NYC DOT: 2004), Project Development & Design Guide (Massachusetts Highway Department: 2006) [PDF], San Francisco Better Streets PlanDraft for Public Review (City and County of San Francisco: June 2008), Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities (New Jersey DOT/Pennsylvania DOT: 2008) [PDF], Parks, Plants, and People: Beautifying the Urban Landscape (Lynden B. Miller: 2009), Trees in the Urban Landscape: Site Assessment, Design, and Installation (Nina L. Bassuk and Peter J. Trowbridge: 2004), Permeable Interlocking Concrete Paver (PICP), Manual on Uniform Traffic Control Devices (MUTCD), National Historic Preservation Act, Section 106, New York State Department of Environmental Conservation (Title 6), New York State Environmental Quality Review Act (SEQR), New York State Historic Preservation Act, Section 14.09, New York State Department of Transportation (Title 17), A Policy on Geometric Design of Highways and Streets, 7th edition, A Guide for Achieving Flexibility in Highway Design, Guide for the Planning, Design, and Operation of Pedestrian Facilities, Guide for the Development of Bicycle Facilities, 4th edition, BIKESAFE: Bicycle Countermeasure Selection System, PEDSAFE: Pedestrian Safety Guide and Countermeasure Selection System, Designing Sidewalks and Trails for Access, Public Involvement Techniques for Transportation DecisionMaking, MUTCD (Manual on Uniform Traffic Control Devices), Roadside Best Management Practices that Benefit Pollinators, Designing Walkable Urban Thoroughfares: A Context Sensitive Approach, The Design and Safety of Pedestrian Facilities, Accessible Public RightsofWay: Planning and Designing for Alterations, The Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities, National Menu of Best Management Practices (BMPs) for Stormwater Management, Active Design Guidelines: Promoting Physical Activity and Health in Design, High Performance Infrastructure Guidelines: Best Practices for the Public RightofWay, Standards for Green Infrastructure (DEP: 2017), ProcedureGoverning Limited Survey for Green Infrastructure, Procedure Governing Limited Geotechnical Investigation for Right-of-Way Green Infrastructure Practices, PlaNYC Sustainable Stormwater Management Plan, Specifications for Traffic Signals and Intelligent Transportation Systems Construction and Equipment, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Select Bus Service Design Guidelines: Update, El-Space Toolkit: Strategies for Reclaiming Sites Beneath Elevated Transportation Infrastructure, Version 1.0, Park Design for the 21st Century: High Performance Landscape Guidelines, Native Planting Species Guide for New York City, Inclusive Design Guidelines: New York City, New York State Stormwater Management Design Manual, San Francisco Better Streets PlanDraft for Public Review, Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities, New York State Environmental Conservation Law (ECL), New York State Vehicle and Traffic Law (VTL), Department of Citywide Administrative Services (Chapter 35), Department of Consumer Affairs (Chapter 64), Department of Design and Construction (Chapter 55), Department of Environmental Protection (Chapter 57), Department of Parks and Recreation (Chapter 21), Department of Small Business Services (Chapter 56), Department of Transportation (Chapter 71), Franchises, Revocable Consents, and Concessions (Chapter 14), Landmarks Preservation Commission (Chapter 74), Public Design Commission/Art Commission (Chapter 37), Contracts, Purchases and Franchises (Title 6), Environmental Protection and Utilities (Title 24), Department of Citywide Administrative Services (Title 55), Department of Environmental Protection (Title 15), Rules Governing the Construction of Private Sewers, Rules Governing the Use of the Water Supply, Department of Parks and Recreation (Title 56), Department of Small Business Services (Title 66), Franchise and Concession Review Committee (Title 12), Landmarks Preservation Commission (Title 63), Public Design Commission/Art Commission (Title 57), Rules of the City of New York (Title 43 and 62), U.S. Traffic Calming Manual (American Planning Association & American Society of Civil Engineers: 2009), Under the Elevated: Reclaiming Space, Connecting Communities (DOT and Design Trust for Public Space: 2015). There are two categories of HIQA holds: Holds for Specific Permit Type or Unique Street Treatment and Holds that May Be Placed on the Permittee. An online permit processing application significantly enhanced the efficiency of NYC DOT permitting operations. NYC DOT has a separate procedure for obtaining authorization for emergency utility access cover openings so that applicants can expeditiously perform such work. The construction, alteration or repair of any building vault or transformer vault requires a permit from NYC DOT. MUST COORDINATE WITH RESIDENT ENGINEER NYSDOT MR.WONG AT 718-499-7075 PRIOR TO WORK. NYC DOT's mission is to provide for the safe, efficient and environmentally responsible movement of pedestrians, goods, bicycles and vehicular traffic on the streets of the city of New York. (212) 442-7962 PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE BENCH. If all the documentation is accepted, pre-determined permit stipulations are added to the permit and the application is sent for processing. MAINTAIN 5 FEET FOR PEDS ON SIDEWALKS 15 FEET OR MORE IN WIDTH. (IV) FIVE FEET OF RAIL ROAD TRACKS. If the hold is not released, the applicant must contact the borough ASHO to determine the feasibility of the work being completed prior to the final resurfacing. LMZ (Lower Manhattan Zone) hold This hold signifies that you are working on a street that falls within the Lower Manhattan Zone (south of and including Canal Street). NYC DOT may order a vault licensee or the owner of the premises where the vault is located to fill in an abandoned vault. Upon completion of updates, the holds will be released. The Highway Rules, Section 2-02(k) contains additional information. THIS PERMIT ONLY ALLOWS FOR THE CLOSURE OF A ROADWAY OR SIDEWALK AS STIPULATED. MAINTAIN 1 LANE IN EACH DIRECTION FROM 9AM-4PM M-F AND 9AM-6PM SAT/SUN. At crossings, the height of Accessible Pedestrian Signals must be reachable by a person using a mobility device, at a preferred height of 42 inches and a maximum height of 48 inches (see 2010 ADA Standards for Accessible Design). 55 Water Street, Concourse Level Tel: (212) 788-3071 The Street Design Manual is New York Citys comprehensive resource for street design standards, guidelines, and policies. Additionally, in the middle of each fiscal year, the New York City Department of Design and Construction (DDC) convenes a meeting with other agencies and utilities to discuss city projects under its purview that are expected to begin construction during the next four years. A full review will typically take between one or two business days. WORK NIGHTLY 9 PM - 6 AM SUNDAY NIGHT TO FRIDAY MORNING AND 9 PM FRIDAY TO 6 AM SUNDAY. For building operations, a crane permit is required for all cranes and derricks operating in the street on building construction or related activity under the jurisdiction of DOB, with the exception of truck cranes with telescopic, hydraulic or folding booms, over 50 feet and not more than 135 feet with a maximum rated capacity of 3 tons, for which a construction activity permit has been issued. VMS BOARD MUST BE REMOVED UPON COMPLETION OF THE APPROVED CLOSURE. PERMITTEE MUST CALL/FAX OEM REGARDING EMERGENCY SITUATION. NO WORK SHALL BE PERFORMED UNDER THIS PERMIT UNLESS ACCOMPANIED BY AN ACTIVE TYPE 204 PERMIT TO MAINTAIN THE FENCE & AN ACTIVE TYPE 215 PERMIT. Poles (POL) hold A POL hold is automatically placed if the proposed permit work is for the installation of a pole on the sidewalk, which must be reviewed, approved and released by NYC DOT Street Lighting. EAU will process the request and fax or call the applicant with an Emergency Street Opening Permit Number, which authorizes the emergency street opening/excavation work. IN SUCH COMMERCIAL DISTRICTS IF MORE THAN 50% OF SIDEWALK FRONTAGE IS REPAIRED/REPLACED THE ENTIRE SIDEWALK MUST BE REPLACED IN CONFORMANCE WITH THE 4.13 C DEPT. Kew Gardens, NY 11424 Manuals and Standards. SECTION 5: DESIGNATED REPRESENTATIVE(S) TO ACCEPT SERVICE OF SUMMONS AT THE APPLICANT'S BUSINESS OFFICE: Enter the names of at least two people who are authorized to accept summonses for his/her corporation and who are located at his/her business address. (212) 839-2410 PARKING OF NON COMMERCIAL VEHICLES ON THE ROADWAY, SIDEWALK OR WITHIN THE WORK ZONE IS PROHIBITED. Check traffic advisories. Existing InfrastructurePermittees must not remove parking meters, traffic signs, street lights, street furniture, and similar items unless authorized on the permit. Fax: (718) 298-7075, Staten Island (part-time office) Once the canopy is installed, the canopy installer or authorized agent must contact the HIQA borough office for a final inspection to determine whether the installed canopy conforms to the submitted plans.
Hadestown Fates Vocal Range, Lisa Simon Krueger, Articles N